Millau Viaduct: Creating an Engineering Marvel


IBS CDC IBS CDC IBS CDC IBS CDC RSS Feed
 
Case Studies | Case Study in Business, Management, Operations, Strategy, Case Study

ICMR HOME | Case Studies Collection

To download Millau Viaduct: Creating an Engineering Marvel case study (Case Code: PROM006) click on the button below, and select the case from the list of available cases:




» Project Management Case Studies
» Case Studies Collection
» ICMR HOME
» Mini Cases Studies
» Micro Cases Studies
» View Detailed Pricing Info
» How To Order This Case
» Business Case Studies
» Area Specific Case Studies
» Industry Wise Case Studies
» Company Wise Case Studies



Please note:

This case study was compiled from published sources, and is intended to be used as a basis for class discussion. It is not intended to illustrate either effective or ineffective handling of a management situation. Nor is it a primary information source.

Case Details:

Price:

Case Code : PROM006 For delivery in electronic format: Rs. 400;
For delivery through courier (within India): Rs. 400 + Rs. 25 for Shipping & Handling Charges

Themes

Project Management
Case Length : 21 Pages
Period : 2001-2004
Pub Date : 2006
Teaching Note : Not Available
Organization : Eiffage TP
Industry : Construction
Countries : France

Abstract:

The Millau viaduct was constructed to solve a severe traffic bottleneck on the A75 highway in France. The cutting-edge technology used in its design and construction, and the impressive aesthetics of the structure made it an engineering marvel. The case describes the inception and the execution of the project.

It discusses the detailed planning that went into the project, and the advanced construction methods adopted by the consortium that took up the project. With careful planning, and by making optimum use of technologies that have become available only recently, the project consortium was able to complete the extremely complex project ahead of schedule.

Issues:

» Gain insights into the planning for a major project.

» Appreciate the importance of planning in order to reduce risks, cost, and delays.

» Understand the importance of technology in modern civil engineering projects.

» Appreciate the possibilities offered by the Build-Operate-Transfer model in the execution of large and complex infrastructure projects

Contents:

  Page No.
Introduction 1
Background Note 2
The Pre-Construction and Planning Stage 4
Construction Begins 6
Completion of the Project 12
Outlook 13
Exhibits 14

Keywords:

Millau viaduct, Project planning, Project management, Construction technology , French engineering, Private sector projects, Project implementation, Eiffage, Eiffel, Build operate and transfer

Millau Viaduct: Creating an Engineering Marvel - Next Page>>

 

Case Studies Links:- Case Studies, Mini Case Studies, Micro Case Studies, Simplified Case Studies.

Other Case Studies:- Multimedia Case Studies, Cases in Other Languages.

Business Reports Link:- Business Reports.

Books:- Text Books, Work Books, Case Study Volumes.